Industry knowledge saved this from schedule disaster (1934)

Industry knowledge saved this from schedule disaster (1934)

When we were first presented with the contract for Detailing this Fire Department facility it was Designed with bar joists in the roof. At the time we knew that joists were running at a two-year delivery period. To keep the schedule intact, we presented a re-design of...
Post processing Distribution (BCO707)

Post processing Distribution (BCO707)

This 900′ belt conveyor takes material from the mill to a drag chain conveyor that distributes product to 4 silos. There is also an option for diverting to horizontal storage facility (a 300 cu. yd. building not shown) as well as a fire...
Transfer Tower AR

Transfer Tower AR

Here’s a Transfer Tower that will eventually end up on the other side of the world, but we thought we’d have a play with it in the new sub-division being created down the road. We can only imagine what the neighbors thought we were up to …...
Load Out Section (2995)

Load Out Section (2995)

Here’s the one Load-Out section of a Biomass plant we designed/detailed. Material comes out of the finishing plant to feed this conveyer that in-turn fills the silo that then feeds the loading conveyor that moves product to the train wagon...
Asymmetry, the $$$ multiplier (11163)

Asymmetry, the $$$ multiplier (11163)

This little civic project turned out to be much more than meets the eye. We first thought that this was a cone with its pointy end cut away. We later discovered that the “vertical” and “horizontal” members were all at different relationships to...