Industry knowledge saved this from schedule disaster (1934)

January 30, 2024

When we were first presented with the contract for Detailing this Fire Department facility it was Designed with bar joists in the roof. At the time we knew that joists were running at a two-year delivery period. To keep the schedule intact, we presented a re-design of the roof system with Wide Flange Rafters. This is the type of service we bring to your projects!