Masibanda Construction Engineering
  • Home
  • Services
  • News
  • About
  • Contact
  • Careers
  • Terms
Select Page

News

Too early for Christmas but ….

August 18, 2022

Yes it might be too early to start posting about Christmas, but these guys need to get moving in order to provide one to special children. We’re proud, and lucky enough to be able, to support this cause and encourage all of our Kiwi collaborators to do so as well. HO, HO, HO …

Share this:

  • Twitter
  • Facebook
  • LinkedIn
  • Telegram
  • WhatsApp
  • Email

Like this:

Like Loading...
← Prev: W.I.P. conveyor system (No.2) Next: Local commercial project (8034) →
  • Home
  • Services
  • News
  • About
  • Contact
  • Careers
  • Terms

Follow Us

Masibanda Logo

Masibanda Construction Engineering
Bowden, GA, USA – Christchurch, NZL – Capetown, RSA
Phone: +1 213 497 0028       +64 3 926 5151

© 2019 Masibanda Construction Engineering Ltd. All rights reserved.
%d